Film Budget Software, in Your Own Currency
The Story Maker builds a full film budget — pre-production, production, and post-production line items — directly from your script breakdown, so cast size, location count, and shoot days already reflect your actual script instead of generic placeholder estimates. Budgets display in your own currency, with INR Lakhs/Crores formatting available for Indian productions.
Before you upload anything
Nothing changes until you Merge
Every edit opens an A/B compare — nothing changes your scene until you Merge.
Your script is never used to train AI
Zero Data Retention on every model — your script is never used to train AI. Zero Data Retention means the model providers we send your pages to are contractually barred from storing them: your script is processed to produce your result and then it is gone from their side. Read the policy.
You stay the author
These tools read your script and tell you what they found. Where they suggest a change, it arrives as a proposal beside your original, never in place of it.
Your work stays yours, and you can delete it
Your projects stay in your account for as long as you use it. An account left completely inactive for 2 years is notified before anything is removed, and you can delete a project or your whole account at any time. Full terms in the privacy policy.
What “A/B compare” means in practice
- Character Voice
- “Rewrites only this character's dialogue — action and other characters stay untouched.”
- Alternate Takes
- “Two contrasting rewrites of this scene, compared side-by-side — pick one, or blend the best of both.”
Both quoted from the editor itself. Every suggestion lands next to your original with a Merge button; declining it leaves the scene exactly as you wrote it.
What's included
Built from your actual production, not a template
Because the budget draws from your script breakdown and shooting schedule, line items reflect your real cast size, location count, and shoot-day count — not a generic template you have to manually adjust line by line. Cast Rates and Crew Rates tools feed realistic department costs into the same budget.
Plan for what goes wrong, not just what goes right
The Contingency Planner adds a realistic buffer on top of your top-sheet, and — for our free Budget Estimator tool specifically — everything exports as a print-ready PDF you can hand to a producer or financier directly.
The top sheet: your budget in one page
A top sheet is the one-page summary a producer or financier actually reads first — pre-production, production, and post-production totals rolled up from every department, without the line-by-line detail underneath. It's the document that answers "what does this film cost" in under a minute, before anyone drills into camera-department rentals or a specific location's permit fees.
The Story Maker generates the top sheet directly from your full line-item budget, so the summary always matches the detail underneath it — there's no separate top-sheet document to keep manually reconciled with the department-level numbers as your script and schedule change.
Film budget template, built from your actual script
Most film budget templates start as a blank spreadsheet with department rows you fill in by hand, estimating cast size and shoot days from memory. The Story Maker's budget starts instead from your script breakdown and shooting schedule, so the template's line items — cast, crew, locations, equipment — are pre-populated with your production's real numbers rather than generic placeholder rows you have to edit one by one.
If you just want a quick template without building a full script breakdown first, the free Budget Estimator gives you the same top-sheet structure — pre-production, production, post-production — as an instant, downloadable starting point.
Above-the-line and below-the-line costs
A film budget conventionally splits into above-the-line costs — the creative deals: writer, director, producer, and principal cast — and below-the-line costs — everything needed to physically produce and finish the film: crew, equipment, locations, post-production. The split matters because above-the-line costs are usually negotiated individually per project, while below-the-line costs scale more predictably with shoot days, cast size, and location count.
The Story Maker's budget keeps both categories connected to your actual production data: below-the-line line items pull from your script breakdown and schedule, while above-the-line deals are tracked alongside them in the same top sheet — so a financier sees the full picture in one document instead of two disconnected spreadsheets.
Top sheet, line items, and numbers that reconcile
A budget is two documents that must agree: the top sheet a financier reads and the line items a line producer works from. When they are maintained separately they diverge, and a top sheet that does not reconcile against its detail is the fastest way to lose a financier's confidence in the rest of the plan.
Both views are built from the same breakdown and schedule data — element counts drive department lines, cast holds drive cast cost, shoot days drive crew and equipment. Change the schedule and the budget sees it rather than being reconciled by hand afterwards.
Your own currency, not a converted approximation
A production plan denominated in the wrong currency is a rough estimate wearing a suit. Crew rates, equipment hire and location fees are all local, and converting a foreign total at the end hides the fact that the underlying assumptions were someone else's market.
Budgets are built in your own currency, with 110 supported at checkout, and cast and crew rates use regional bands so the figures reflect where you are actually producing.
Frequently asked questions
Can I see my budget in a currency other than INR?
Yes — checkout and budget display support 110 currencies, auto-detected for your region, in addition to native INR Lakhs/Crores formatting for Indian productions.
Is there a free version I can try without signing up?
Yes — the free Budget Estimator lets you build a top-sheet and export a PDF without an account; the full Budget tool (tied to your script breakdown) is part of the platform after signup.
Can I start budgeting before the script is locked?
Yes, and most productions do — an early budget built from a treatment or partial breakdown is a planning instrument, not a commitment. It gets more accurate as the breakdown and schedule firm up, because those are what drive the numbers.
Does it handle above-the-line and below-the-line separately?
Yes — the top sheet follows the standard account structure, so it reads the way a financier or line producer expects rather than requiring them to learn your layout.
Can I export to Excel?
Yes. Budgets export to PDF for distribution and XLSX so a line producer can work in the tool they already use. There is also a free budget top sheet template if you want to start from a blank one.
Start free with 2,500 credits — no card needed.
Pay-as-you-go credits, not a subscription. Every tool shows its cost before you run it.
Start FreeWhat we're learning, once a week
Real numbers on making films with AI — costs, workflows, and what actually works. No pitch, unsubscribe anytime.